Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system built to comply with strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based https://bookmarklinx.com/story20725261/penmann-completes-major-hvac-upgrade-for-nutricia-s-liverpool-site-to-align-with-the-fsi-development-programme