As viewed within the figure beneath, continuous auger is accustomed to drill the borehole, lift up drilled soil, and pour concrete while the auger is moved up. Therefore, the borehole will not want casing or hydrostatic tension to circumvent harm to the borehole wall. Piles ended up casted larger than https://cast-in-situ-piles-in-ban10763.ttblogs.com/12120490/the-best-side-of-cast-in-situ-piles-in-dhaka